Vineyard Golf Course Irrigation Pumping Plant Station
Sector: Water Supply and Storage • Location: Cincinnati, Ohio, United States of America
Source: Dodge USA
Vineyard Golf Course Irrigation Pumping Plant Station - Scope of Work Includes: 1. Prefabricated pumping plant with enclosure. 2. Pumping plant discharge pipe. 3. Pumping plant intake pipe. 4. Lake fill flow control assembly. 5. Freight from the manufacturer to the golf course. 6. Off-loading of the pumping plant at the golf course. 7. Oversight and assistance for off-loading, setting the pumping
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Rail, Government, Commercial, Raw Materials
- Location
- Cincinnati, Ohio, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Vineyard Golf Course Irrigation Pumping Plant Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Vineyard Golf Course Irrigation Pumping Plant Station - Scope of Work Includes: 1. Prefabricated pumping plant with enclosure. 2. Pumping plant discharge pipe. 3. Pumping plant intake pipe. 4. Lake fill flow control assembly. 5. Freight from the manufacturer to the golf course. 6. Off-loading of the pumping plant at the golf course. 7. Oversight and assistance for off-loading, setting the pumping plant, and installation by a factory trained and authorized pump system technician. 8. Pumping pl... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Ohio |
City | Cincinnati |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Rail, Government, Commercial, Raw Materials |
Article published date | 2024-04-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
