Vineyard Wind 2 Offshore Wind Farm - 800 MW
Sector: Telecommunications • Location: Barnstable, Massachusetts, United States of America
Source: Dodge USA
1.2 GW offshore wind facility, enough to power more than 650,000 homes. To include an onshore cable route and substation. Staging site for the wind turbine installation is the Salem Offshore Wind Terminal in MA, foundation components to be made in Providence, Rhode Island, when finished operations and maintenance will be at the New Bedford Foss Marine Terminal in MA. Export cables would land in Ne
- Status
- Prospective
- Sector
- Telecommunications, Wind, Residential, Raw Materials, Commercial, Power Generation (CCGT), Power Transmission, Road
- Location
- Barnstable, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Vineyard Wind 2 Offshore Wind Farm - 800 MW
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1.2 GW offshore wind facility, enough to power more than 650,000 homes. To include an onshore cable route and substation. Staging site for the wind turbine installation is the Salem Offshore Wind Terminal in MA, foundation components to be made in Providence, Rhode Island, when finished operations and maintenance will be at the New Bedford Foss Marine Terminal in MA. Export cables would land in New London, CT and interconnect with the New England power grid in Montville |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Barnstable |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Wind, Residential, Raw Materials, Commercial, Power Generation (CCGT), Power Transmission, Road |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
