Vineyard Wind and New England Clean Energy Connect Winter Integration
Sector: Power Generation (CCGT) • Location: Concord, New Hampshire, USA
Source: Patch
ISO New England expects to have 31,041 MW of available electric capacity for the winter season, including contributions from current generating sources, the Vineyard Wind project, and increased imported Hydro Quebec energy via the New England Clean Energy Connect transmission line through Maine. Both the Vineyard Wind and New England Clean Energy Connect projects are expected to be online this win
- Status
- Prospective
- Sector
- Power Generation (CCGT), Wind, Hydro
- Location
- Concord, New Hampshire, United States of America
- Updated
- 22 Jul 2026
- Source
- Patch
ConstructChat
Ask ConstructChat about Vineyard Wind and New England Clean Energy Connect Winter Integration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned to be online |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | ISO New England expects to have 31,041 MW of available electric capacity for the winter season, including contributions from current generating sources, the Vineyard Wind project, and increased imported Hydro Quebec energy via the New England Clean Energy Connect transmission line through Maine. Both the Vineyard Wind and New England Clean Energy Connect projects are expected to be online this winter and are included in ISO-NE's assessments. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | New Hampshire |
City | Concord |
Source
Source | Patch |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Wind, Hydro |
Article published date | 2025-11-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in USA
- Widen Turnpike SR 91 from Golden Glades Toll Plaza to the Broward County
- Lotte Chemical MEG-1 Project
- Fourth Avenue Corridor Utility Replacement - MEP Bidders
- Utility Work on I-75
- Google and Elementl Power Nuclear Energy Partnership
- Tanker On-Shore Power Supply Compatibility Assessment
- East Hampton Circle Reconstruction
- Rice University Data Center Heat to Electricity Project
