logo
ProjectActive

Vinh Tan 1 Coal Plant

Sector: Government • Location: Vietnam

Source: World Bank Group

Vietnam National Coal and Mineral Industries Group (Vinacomin), China Southern Power Grid Company (CSG) and China Power International Holdings (CPIH) were developing the 1,200MW Vinh Tan 1 coal-fired power plant, Vinh Tan Commune, Tuy Phong District, Binh Thuan Province. CPIH operates via its subsidiary China Power International Development Limited. CPIH is itself a subsidiary of China Power Inv

Status
Prospective
Sector
Government, Manufacturing (Industrial), Power Generation (CCGT), Commercial
Location
Vietnam
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Vinh Tan 1 Coal Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Vinh Tan 1 Coal Plant” is an infrastructure initiative in the Government sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Vietnam National Coal and Mineral Industries Group (Vinacomin), China Southern Power Grid Company (CSG) and China Power International Holdings (CPIH) were developing the 1,200MW Vinh Tan 1 coal-fired power plant, Vinh Tan Commune, Tuy Phong District, Binh Thuan Province. CPIH operates via its subsidiary China Power International Development Limited. CPIH is itself a subsidiary of China Power Investment Corporation, from Hong Kong (China). The project was developed under a BOT contract, signed December 26 2012. The contract length was 25 years (of operation). Commissioning was expected for 2017. Initially, the project was expected to become operational in 2010-2011 with construction starting in November 2009, but negotiations starting in November 2006 have taken longer than expected. Power was to be supplied to Electricity of Vietnam (EVN). An MOU on the project was signed in November 2006. Initial principals on the BOT contract was signed in March 2008. The master plan for the Vinh Tan-Binh Thuan Power Center, which included Vinh Tan 1, 2 and 3, was signed into law with Decision 1532/QD-BCN in May 2007. Total project cost was US$1.74 billion. Advisors to the deal were Allen & Overy, Clifford Chance, Vilaf Hong Duc, and Audier & Partners. The project holds a government guarantee (not further specified). Financing comprises a US$1.4 billion facility provided by a syndicate of BOC, China Construction Bank, China Development Bank Corp, ICBC and EXIM Bank of China. Loan agreement was signed on 23 Oct 2014. http://vietmaz.com/2012/12/initialing-contract-on-vinh-tan-1-bot-project/#.US6UumGdbng http://talkvietnam.com/2012/12/bot-contract-signed-for-vinh-tan-1-thermoelectric-plant/#.UcSE-mGWW7w http://www.hoganlovells.com/files/Publication/8bb66561-fa60-43d5-ad7b-750f0b5062fc/Presentation/PublicationAttachment/2b7de9f1-f623-45e4-a38f-77312887cd12/res32ABFFA9EBEE4F7BA390BB812050D15E.pdf

Original sector

Energy

Budget

Location

Country

Vietnam

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Government, Manufacturing (Industrial), Power Generation (CCGT), Commercial

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project