Vinton Steel LLC Steel Plant Expansion & Modernization
Sector: Water Supply and Storage • Location: Vinton, Texas, United States of America
Source: Dodge
Modernization of an existing rolling mill and construction of a new steel plant in Vinton. The project includes 1.5 million sq ft of building space, various steel production equipment, and supporting facilities. The expansion will increase production capacity for rebar and round steel to 300,000 tons per year. Electrical substation, water and fume treatment plants, maintenance facility and equipme
- Status
- Prospective
- Sector
- Water Supply and Storage, Steel, Commercial, Power Generation (CCGT), Warehouse, Metal, Manufacturing (Industrial)
- Location
- Vinton, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Vinton Steel LLC Steel Plant Expansion & Modernization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Design Development |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Modernization of an existing rolling mill and construction of a new steel plant in Vinton. The project includes 1.5 million sq ft of building space, various steel production equipment, and supporting facilities. The expansion will increase production capacity for rebar and round steel to 300,000 tons per year. Electrical substation, water and fume treatment plants, maintenance facility and equipment foundations; erection of structural steel; installation of an electric arc furnace, ladle furn... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Vinton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Commercial, Power Generation (CCGT), Warehouse, Metal, Manufacturing (Industrial) |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
