VIOL 19-27 Egremont RD
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
Remove concrete saturated by leaking oil filler pipe, install supports for lintel, form for and pour concrete to replace area removed. All new concrete to be connected to old by 1'-0" #4 rebar pins epoxied into old work every 2'-0". Bonding agent to be applied to all existing concrete surfaces to be abutted by new concrete. To correct violation V134825
- Status
- Prospective
- Sector
- Oil and Gas, Steel, Cement, Commercial, Government
- Location
- Brighton, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about VIOL 19-27 Egremont RD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Remove concrete saturated by leaking oil filler pipe, install supports for lintel, form for and pour concrete to replace area removed. All new concrete to be connected to old by 1'-0" #4 rebar pins epoxied into old work every 2'-0". Bonding agent to be applied to all existing concrete surfaces to be abutted by new concrete. To correct violation V134825 |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Brighton |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Steel, Cement, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
