VIOL 405-411 Blue Hill AV
Sector: Metal • Location: Dorchester, Massachusetts, United States of America
Source: City of Boston
remove existing signs, replace sign ,reframe damage wall, install new store front metal, glass.door etc install sheet rock and plaster on intiror walls install new ceiling tiles new sub floor and tile paint all walls yiol correct V179785.
- Status
- Prospective
- Sector
- Metal, Commercial, Government, Residential
- Location
- Dorchester, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about VIOL 405-411 Blue Hill AV
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | remove existing signs, replace sign ,reframe damage wall, install new store front metal, glass.door etc install sheet rock and plaster on intiror walls install new ceiling tiles new sub floor and tile paint all walls yiol correct V179785. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Dorchester |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Metal, Commercial, Government, Residential |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
