Virgin Hyperloop One PPP
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The technology for Hyperloop One is currently in the early stages of the commercialization after a successful first full scale test outside Las Vegas. The latest series of tests achieved record speeds in a tube depressurized down to the equivalent of air at 200,000 feet above sea level. All components of the system were successfully tested, including the highly efficient electric motor, advanced c
- Status
- Failure
- Sector
- Automotive, Tunnel, Commercial, Power Generation (CCGT), Road
- Location
- West Palm Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Virgin Hyperloop One PPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Abandoned |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The technology for Hyperloop One is currently in the early stages of the commercialization after a successful first full scale test outside Las Vegas. The latest series of tests achieved record speeds in a tube depressurized down to the equivalent of air at 200,000 feet above sea level. All components of the system were successfully tested, including the highly efficient electric motor, advanced controls and power electronics, custom magnetic levitation and guidance, pod suspension and vacuum... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | West Palm Beach |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Tunnel, Commercial, Power Generation (CCGT), Road |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
