logo

Virginia 2.4 GW Data Center and Solar Project Permitting

Sector: Data Center • Location: Hanover County, Virginia, United States

Source: Distilled | Michael Thomas

Project
Approved For Data Center, Denied For Solar Project

A 2.4 GW data center was approved in Hanover County, Virginia, while a 20 MW solar project was denied. At least 10 Virginia counties have enacted bans or severe restrictions on solar energy projects, including Mecklenburg County which removed utility-scale solar as an allowed land use in April 2025. This reflects local opposition impacting clean energy project approvals in the state.

Status
Prospective
Sector
Data Center, Power Generation (CCGT), Power Transmission, Solar
Location
Hanover County, Virginia, United States of America
Updated
22 Jul 2026
Source
Distilled | Michael Thomas

ConstructChat

Ask ConstructChat about Virginia 2.4 GW Data Center and Solar Project Permitting

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Virginia 2.4 GW Data Center and Solar Project Permitting” is an infrastructure initiative in the Data Center sector, located in Hanover County, Virginia, United States. Taiyo aggregates data on it from Distilled | Michael Thomas.

Participants

Not available for this record.

Status

Original status

approved for data center, denied for solar project

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 2.4 GW data center was approved in Hanover County, Virginia, while a 20 MW solar project was denied. At least 10 Virginia counties have enacted bans or severe restrictions on solar energy projects, including Mecklenburg County which removed utility-scale solar as an allowed land use in April 2025. This reflects local opposition impacting clean energy project approvals in the state.

Original sector

Energy

Location

Country

United States of America (USA)

State

Virginia

City

Hanover County

Source

Source

Distilled | Michael Thomas

URL

More Details

Record type

Project

Sector

Data Center, Power Generation (CCGT), Power Transmission, Solar

Article published date

2025-12-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project