Virginia Tech - Center Woods Complex
Sector: Raw Materials • Location: Blacksburg, Virginia, United States of America
Source: Dodge
Virginia Tech Board of Visitors Building and Grounds Committee approved the design preview and review to move forward with a new, state-of-the-art facility for the Department of Fish and Wildlife Conservation, creating a vibrant hub for research, teaching, and outreach in the College of Natural Resources and Environment. The new Center Woods Complex will be adjacent to Plantation Road in a wooded
- Status
- Closed
- Sector
- Raw Materials, Road, Commercial, Education
- Location
- Blacksburg, Virginia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Virginia Tech - Center Woods Complex
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Virginia Tech Board of Visitors Building and Grounds Committee approved the design preview and review to move forward with a new, state-of-the-art facility for the Department of Fish and Wildlife Conservation, creating a vibrant hub for research, teaching, and outreach in the College of Natural Resources and Environment. The new Center Woods Complex will be adjacent to Plantation Road in a wooded area long used for field research, outdoor learning, and wildlife studies. The project will add a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Virginia |
City | Blacksburg |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Road, Commercial, Education |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in United States of America
- SR 138@CR 55/NUNNALLY FARM RD RT TURN LN
- JUSTIN and J. LOHR Center for Wine and Viticulture
- William and Linda Frost Center for Research and Innovation
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- LIVESTOCK AMENDMENTS
- CUP AND MSPR FOR NEW INDUSTRIAL CAMPUS WITH 2 SHELL BUILDING (232,653 AND 154,618 SF) AT FORMER BERKELEY FARMS SITE
- VINYL-LINER SWIMMING POOL LOCATED IN REAR YARD
- Dwight D. Eisenhower Memorial
