Virtual Power Plant Pilot Development
Under construction · Texas · Last reported Feb 2025
Source: Utility Dive
The aggregated distributed energy resource pilot program in Texas has been moved to the Electric Reliability Council of Texas (ERCOT) for better engagement with market participants. The pilot currently provides 25.5 MW of energy and aims to harness 80 MW of flexible resources.
- Status
- Under Construction
- Sector
- Power Transmission, Power Generation (CCGT)
- Location
- Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Utility Dive
ConstructChat
Ask ConstructChat about Virtual Power Plant Pilot Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The aggregated distributed energy resource pilot program in Texas has been moved to the Electric Reliability Council of Texas (ERCOT) for better engagement with market participants. The pilot currently provides 25.5 MW of energy and aims to harness 80 MW of flexible resources. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Texas |
Source
Source | Utility Dive |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Power Generation (CCGT) |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
