logo

Vishnuprayag Hydroelectric Project

Sector: Water Supply and Storage • Location: India

Source: World Bank Group

Project
Active

Jaiprakash Power Ventures Ltd. (JVPL) undertook the development of 400 MW Vishnuprayag Hydroelectric Project (VHP) on Alaknanda river, in Chamoli district in Uttaranchal State, on build-own-operate (BOO) basis. The power generated from this project was to be sold to Uttar Pradesh Power Corporation Ltd (UPPCL), a transmission and distribution utility operating in Uttar Pradesh State, under a 30 yea

Project Information FAQ

Project Information

5 Q
The project “Vishnuprayag Hydroelectric Project” is an infrastructure initiative in the Water Supply and Storage sector, located in India. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Jaiprakash Power Ventures Ltd. (JVPL) undertook the development of 400 MW Vishnuprayag Hydroelectric Project (VHP) on Alaknanda river, in Chamoli district in Uttaranchal State, on build-own-operate (BOO) basis. The power generated from this project was to be sold to Uttar Pradesh Power Corporation Ltd (UPPCL), a transmission and distribution utility operating in Uttar Pradesh State, under a 30 year power purchase agreement (PPA). The project consisted of 4 generator units, each producing 100 MW each. This hydroelectric plant was designed to be a "run of the river" scheme and did not require any storage facilities like dam or reservoir. JPVL, a special purpose company, was a wholly owned subsidiary of India’s Jaiprakash Associates Limited. The total cost of the project was estimated at US$ 408 million. The project reached financial closure in 2003 with a debt equity ratio of 70:30. The project debt consisted of rupee term loans (US$ 253.65 million) and foreign currency loans (US$ 32 million). JVPL signed the PPA with UPPCL in September 2002. This PPA was guaranteed by Uttar Pradesh State government for payment obligations of UPPCL. The 30 year term of the PPA began from the date of commercial operation of the last unit. Under the PPA, 12% of the total power generated was to be supplied to Uttaranchal State for free. Construction works began in 2003 and the project was expected to be commissioned in June 2006.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data