logo

Vista Alegre I and Vista Alegre II Thermal Power Plants

Sector: Steel • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Energisa Geracao FIP Biomassa, a subsidiary of group Energisa Geracao , was granted authorizations to build and operate four sugar-cane-residue fueled power plants located in the state of Mato Grosso do Sul (175 MW in total capacity). The sponsors created special purpose companies to manage each power plant, detailed below:

  • Energisa Bioeletricidade Vista Alegre I - UTE Vis

Project Information FAQ

Project Information

5 Q
The project “Vista Alegre I and Vista Alegre II Thermal Power Plants” is an infrastructure initiative in the Steel sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Brazilian company Energisa Geracao FIP Biomassa, a subsidiary of group Energisa Geracao , was granted authorizations to build and operate four sugar-cane-residue fueled power plants located in the state of Mato Grosso do Sul (175 MW in total capacity). The sponsors created special purpose companies to manage each power plant, detailed below: * Energisa Bioeletricidade Vista Alegre I - UTE Vista Alegre I (30 MW) - Investment: US$ 40.2 million (BRL 94.55 million) * Energisa Geracao Vista Alegre II - UTE Vista Alegre II (30 MW) - Investment: US$ 40.2 million (BRL 94.55 million) A 30-year authorization contract was granted by the regulatory agency ANEEL to UTE Vista Alegre I in December 2008, and 35-year authorization for the others starting in 2014. The construction works at the UTE Vista Alegre I and UTE Vista Alegre II commenced in January 2014 and August 2013, respectively. As of December 2014, works were in advanced stage, and operations were expected to begin in early 2015. The government periodically runs public bidding for the sale of energy to the country´s distribution companies. UTE Vista Alegre I and UTE Vista Alegre II won the public bidding that took place in December 2013 by offering an average tariff of US$ 56.6/MWh (BRL 133.00/MWh). The project companies signed 25-year power purchase agreements with the several electricity distribution companies. The project companies were granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelated depreciation methods of accounting for construction expenditures. In December 2014, the Brazilian company Geracao Bioeletricidade Holding S.A., a subsidiary of the Canadian group Brookfield, acquired the power plants from Energisa Geracao.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data