Vista Alegre I and Vista Alegre II Thermal Power Plants

Sector: Biomass • Location: Brazil

Source: World Bank Group

Project
Active

The Brazilian company Energisa Geracao FIP Biomassa, a subsidiary of group Energisa Geracao , was granted authorizations to build and operate four sugar-cane-residue fueled power plants located in the state of Mato Grosso do Sul (175 MW in total capacity). The sponsors created special purpose companies to manage each power plant, detailed below:

  • Energisa Bioeletricidade Vista Alegre I - UTE Vis
Status
Prospective
Sector
Biomass, Commercial, Geothermal, Power Generation (CCGT), Steel, Government, Manufacturing (Industrial)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Vista Alegre I and Vista Alegre II Thermal Power Plants

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Vista Alegre I and Vista Alegre II Thermal Power Plants” is an infrastructure initiative in the Biomass sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Brazilian company Energisa Geracao FIP Biomassa, a subsidiary of group Energisa Geracao , was granted authorizations to build and operate four sugar-cane-residue fueled power plants located in the state of Mato Grosso do Sul (175 MW in total capacity). The sponsors created special purpose companies to manage each power plant, detailed below: * Energisa Bioeletricidade Vista Alegre I - UTE Vista Alegre I (30 MW) - Investment: US$ 40.2 million (BRL 94.55 million) * Energisa Geracao Vista Alegre II - UTE Vista Alegre II (30 MW) - Investment: US$ 40.2 million (BRL 94.55 million) A 30-year authorization contract was granted by the regulatory agency ANEEL to UTE Vista Alegre I in December 2008, and 35-year authorization for the others starting in 2014. The construction works at the UTE Vista Alegre I and UTE Vista Alegre II commenced in January 2014 and August 2013, respectively. As of December 2014, works were in advanced stage, and operations were expected to begin in early 2015. The government periodically runs public bidding for the sale of energy to the country´s distribution companies. UTE Vista Alegre I and UTE Vista Alegre II won the public bidding that took place in December 2013 by offering an average tariff of US$ 56.6/MWh (BRL 133.00/MWh). The project companies signed 25-year power purchase agreements with the several electricity distribution companies. The project companies were granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelated depreciation methods of accounting for construction expenditures. In December 2014, the Brazilian company Geracao Bioeletricidade Holding S.A., a subsidiary of the Canadian group Brookfield, acquired the power plants from Energisa Geracao.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Commercial, Geothermal, Power Generation (CCGT), Steel, Government, Manufacturing (Industrial)

Article published date

2024-05-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project