Vistancia Zone 5W Waterline Improvements
Sector: Power Transmission • Location: Peoria, Arizona, United States of America
Source: Dodge USA
This project provides for the project coordination, public involvement, design, land acquisition, construction, materials testing, construction administration, utility coordination, and all related sitework for the construction of approx. 2,500 linear feet of 24-inch waterline near Lone Mountain Parkway and Loop 303. The new waterline will connect the Zone 4/5 Booster Pump Station to an existing 2
- Status
- Prospective
- Sector
- Power Transmission, Steel, Water Supply and Storage, Government, Road, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Peoria, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Vistancia Zone 5W Waterline Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project provides for the project coordination, public involvement, design, land acquisition, construction, materials testing, construction administration, utility coordination, and all related sitework for the construction of approx. 2,500 linear feet of 24-inch waterline near Lone Mountain Parkway and Loop 303. The new waterline will connect the Zone 4/5 Booster Pump Station to an existing 24-inch waterline in Lone Mountain Parkway, providing additional redundancy and improved system pr... |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Peoria |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Steel, Water Supply and Storage, Government, Road, Commercial, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
