Vitol Sankofa
Completed · Ghana
Source: International Finance Corporation (IFC)
The Sankofa and Gye Nyame gas fields (“Sankofa Gas Field”) and the Sankofa East oil field are located 55 to 60km offshore in the Western Region of Ghana. The fields are part of the Offshore Cape Three Points (OCTP) block. Water depths in the block range from approximately 520 m to 1014 m. The OCTP project (“the project” will be developed in two phases by a joint venture (JV), composed of Eni Gh
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Oil and Gas, Government
- Location
- Ghana
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Vitol Sankofa
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Sankofa and Gye Nyame gas fields (“Sankofa Gas Field”) and the Sankofa East oil field are located 55 to 60km offshore in the Western Region of Ghana. The fields are part of the Offshore Cape Three Points (OCTP) block. Water depths in the block range from approximately 520 m to 1014 m. The OCTP project (“the project” will be developed in two phases by a joint venture (JV), composed of Eni Ghana Exploration and Production Limited (“Eni Ghana”), the operator of the block holding 44.444% participating interest, Vitol Upstream Ghana Limited (“Vitol”) holding 35.556% participating interest, and Ghana National Petroleum Corporation (GNPC) holding 20% participating carried interest.Phase-1 of the OCTP encompasses the development of the Sankofa oil field with first oil planned for 2017, and Phase-2 caters for the development of non-associated gas (NAG) in the Sankofa Gas Field, with the first gas production planned for 2018. Estimated discovered reserves are 1,079 BCF (236 MMboe) of NAG and 132 million barrels of oil. The OCTP project will be developed as an integrated two-phase project.Eni Ghana, as operator and on behalf of the partner group, has developed two Environmental, Social and Health Impact Assessment (“ESHIA”) studies, the findings of which constitute the two Environmental Impact Statements (EIS) required by the Ghana Environmental Protection Agency (“EPA”) for Phase 1 and Phase 2 developments. The draft final Ghana OCTP Block Phase-1 ESHIA was submitted to the EPA on 26th January 2015, the scoping report for OCTP Block Phase-2 ESHIA was submitted to EPA on December 30th while the draft for OCTP Block Phase-2 ESHIA was issued on 19th March 2015.The proposed World Bank Group support to the final project security and financing structure includes the following:1) World Bank (IDA) Guarantees to support Phase-2 investments of the Project;2) Vitol has applied for a MIGA guarantee against the risks of transfer restriction, expropriation, and breach of contract. MIGA may also provide coverage for non-shareholder loans from commercial lenders yet to be identified; and3) IFC loan as part of a debt financing package for Vitol.A joint World Bank Group Environmental and Social Review Summary will be published at a later date. |
Original sector | B-AB - Oil and Gas Production (Includes Development) |
Location
Country | Ghana |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Oil and Gas, Government |
Article published date | 2025-09-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Ghana
- Establishment of Commercial Poultry Farm
- Ghalia Ghana Company Limited
- Zoompak Teshie Transfer Station and Medical Waste Treatment Facility
- Ghana - Improved Sanitation and Water Supply Service Delivery to the Urban Poor in Ghana through Tripartite Partnerships
- Bridge Power Project Tema
- Fruits and Vegetables Production
- Production of Salt
- Tema Container Terminal
