logo

Vitol Sankofa

Sector: Water Supply and Storage • Location: Ghana

Source: International Finance Corporation (IFC)

Project
Completed

The Sankofa and Gye Nyame gas fields (“Sankofa Gas Field”) and the Sankofa East oil field are located 55 to 60km offshore in the Western Region of Ghana. The fields are part of the Offshore Cape Three Points (OCTP) block. Water depths in the block range from approximately 520 m to 1014 m. The OCTP project (“the project” will be developed in two phases by a joint venture (JV), composed of Eni Gh

Project Information FAQ

Project Information

4 Q
The project “Vitol Sankofa” is an infrastructure initiative in the Water Supply and Storage sector, located in Ghana. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Sankofa and Gye Nyame gas fields (“Sankofa Gas Field”) and the Sankofa East oil field are located 55 to 60km offshore in the Western Region of Ghana. The fields are part of the Offshore Cape Three Points (OCTP) block. Water depths in the block range from approximately 520 m to 1014 m. The OCTP project (“the project” will be developed in two phases by a joint venture (JV), composed of Eni Ghana Exploration and Production Limited (“Eni Ghana”), the operator of the block holding 44.444% participating interest, Vitol Upstream Ghana Limited (“Vitol”) holding 35.556% participating interest, and Ghana National Petroleum Corporation (GNPC) holding 20% participating carried interest.Phase-1 of the OCTP encompasses the development of the Sankofa oil field with first oil planned for 2017, and Phase-2 caters for the development of non-associated gas (NAG) in the Sankofa Gas Field, with the first gas production planned for 2018. Estimated discovered reserves are 1,079 BCF (236 MMboe) of NAG and 132 million barrels of oil. The OCTP project will be developed as an integrated two-phase project.Eni Ghana, as operator and on behalf of the partner group, has developed two Environmental, Social and Health Impact Assessment (“ESHIA”) studies, the findings of which constitute the two Environmental Impact Statements (EIS) required by the Ghana Environmental Protection Agency (“EPA”) for Phase 1 and Phase 2 developments. The draft final Ghana OCTP Block Phase-1 ESHIA was submitted to the EPA on 26th January 2015, the scoping report for OCTP Block Phase-2 ESHIA was submitted to EPA on December 30th while the draft for OCTP Block Phase-2 ESHIA was issued on 19th March 2015.The proposed World Bank Group support to the final project security and financing structure includes the following:1) World Bank (IDA) Guarantees to support Phase-2 investments of the Project;2) Vitol has applied for a MIGA guarantee against the risks of transfer restriction, expropriation, and breach of contract. MIGA may also provide coverage for non-shareholder loans from commercial lenders yet to be identified; and3) IFC loan as part of a debt financing package for Vitol.A joint World Bank Group Environmental and Social Review Summary will be published at a later date.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data