Vlasbrug Bridge / SBE nv

Sector: Steel • Location: Belgium

Source: ArchDaily

Project
Closed

By working with three materials, namely steel, concrete, and soil, it was possible to achieve an expressive dynamic in the architectural design. And that both in the overall image of the bridge but also in the experience of the user on the bridge itself. The embankment at the approaches gives the feeling that the bridge is literally anchored in its environment. Then there is the concrete slope in

Project Information FAQ

Project Information

3 Q
The project “Vlasbrug Bridge / SBE nv” is an infrastructure initiative in the Steel sector, located in Belgium. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

By working with three materials, namely steel, concrete, and soil, it was possible to achieve an expressive dynamic in the architectural design. And that both in the overall image of the bridge but also in the experience of the user on the bridge itself. The embankment at the approaches gives the feeling that the bridge is literally anchored in its environment. Then there is the concrete slope in a straight movement that allows and gives you time to experience the steel bridge as a true star player. Once on the steel bridge, one follows the organic line from low to high and back again so the experience on the bridge itself differs in every spot.An S-shaped route was chosen based on the existing traffic flows and recreational hotspots in the area. It was also decided to keep the bridge on the "inside" of the banks so that everything can remain within the limits of the public domain and the current towpaths do not have to be diverted. The construction thus largely follows the already formed lines within the landscape (Lyss - rows of trees - towpaths).The structure over the width of the river is conceived as a symmetrical steel arch, which follows the inverse bending momentum diagram and thus obtains a logical, organic form that fits within the natural landscape. On both banks, a straight, concrete ramp connects the central bridge to the adjacent towpaths. Earthen slopes on both approaches anchor the whole in its surroundings.Towpaths parallel to rivers and canals are generally intensively used routes for cyclists and pedestrians, both recreationally and functionally. To improve the functionality of these paths, a connection over the river Lyss between the municipalities ofWielsbekeand Waregem was necessary. De Vlaamse Waterweg commissioned SBE to design a cyclist and pedestrian bridge that spans the river in a comfortable way without disturbing the canal landscape or its ecological value. SBE therefore designed a sober, down-to-earth bridge that harmonizes with its surroundings.Text description provided by the architects.De Vlaamse Waterweg nv is part of the Flemish administration. Their main objective is the maintenance of all waterways that cross the region, including the adjacent land area and infrastructure. They strive to increase the quality and attractiveness, not only for water transport but also for life surrounding the waterways, by increasing the ecological, water regulating, mobility, and recreational value of their infrastructure.The ambition was to give the bridge as slender a view as possible. Therefore, among other things, the uprights of the bridge were inclined outward so that one has more space at steering height without having to widen the bridge deck and also so that certain shadow lines were generated on the outside. This inclination was also continued over the concrete slopes and in combination with its concrete pillars below.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data