Voisey's Bay Dock Project
Sector: Cement • Location: Canada
Source: Bird Construction
Each circular cell consisted of 154 steel sheet piles each measuring 26.5-metres in length. Two spud barges equipped with crawler cranes positioned templates and drove the steel sheet piles around the cell circumference. A total of 42,050 cubic metres of crushed jaw run material was placed using backfilling operations. Wharf cells were protected using concrete ring beams measuring 5 x 3 x 0.6 metr
- Status
- Unknown
- Sector
- Cement, Steel, Metal
- Location
- Canada
- Updated
- 22 Jul 2026
- Source
- Bird Construction
ConstructChat
Ask ConstructChat about Voisey's Bay Dock Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | unknown |
Taiyo status | Unknown |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Each circular cell consisted of 154 steel sheet piles each measuring 26.5-metres in length. Two spud barges equipped with crawler cranes positioned templates and drove the steel sheet piles around the cell circumference. A total of 42,050 cubic metres of crushed jaw run material was placed using backfilling operations. Wharf cells were protected using concrete ring beams measuring 5 x 3 x 0.6 metres. A total of 56 ring beams were installed. |
Location
Country | Canada |
Source
Source reliability | High |
Source | Bird Construction |
URL |
More Details
Record type | Project |
Sector | Cement, Steel, Metal |
Article published date | 2023-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
