logo

Volker Energy Solutions delivers land station HKZ

Sector: Power Generation (CCGT)

Source: Energy Projects & Technology

Project

Land station Hollandse Kust Zuid is ready for use. Volker Energy Solutions transferred the new high-voltage substation on Maasvlakte 2 to TenneT during the delivery time. The request from client TenneT consisted of realising the installation scope for the land station in greenfield. This feat of realising this complete station on a bare surface is one of the specialties of Volker Energy Solutions.

Project Information FAQ

Project Information

3 Q
The project “Volker Energy Solutions delivers land station HKZ” is an infrastructure initiative in the Power Generation (CCGT) sector. Taiyo aggregates data on it from Energy Projects & Technology.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Land station Hollandse Kust Zuid is ready for use. Volker Energy Solutions transferred the new high-voltage substation on Maasvlakte 2 to TenneT during the delivery time. The request from client TenneT consisted of realising the installation scope for the land station in greenfield. This feat of realising this complete station on a bare surface is one of the specialties of Volker Energy Solutions. The power that will go to this land station will come from the offshore wind farms. Tennet is fully engaged in optimising and expanding its network in the context of the energy transition and the resulting increased demand for Electricity. Collaboration with TenneT is key to success The order consisted primarily of the 220 / 380kV switchgear and a 33kV distribution system. Furthermore, the secondary, tertiary and telecom installations had to be made for the control, signalling and power supply. The primary, secondary and telecom design was provided by TenneT, on which Volker-ES carried out detailed engineering to realize the panels. The entire tertiary scope is designed, built and connected by our people. The project was carried out according to plan to the satisfaction of client TenneT, which is largely due to the pleasant cooperation with the TenneT team. Together, the project has been brought to a safe and successful conclusion! Source: https://www.vshanab.nl/Image source: Courtesy of Volker Energy Solutions Read more Wind power news here

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data