Voluntary certification scheme for waste treatment
Sector: Warehouse • Location: Switzerland, Germany, Japan, Belgium, Austria, Netherlands, Finland
Source: EU Funding & Tenders Portal
The CEWASTE project contributes to an improved recovery of valuable and critical raw materials (CRMs) from key types of waste through traceable and sustainable treatment processes in the entire supply chain of secondary raw materials. As such, CEWASTE will address the specific challenge to secure the sustainable access to CRMs for the EU economy and objectives set by the EU action plan for the Cir
- Status
- Closed
- Sector
- Warehouse, Education
- Location
- Switzerland, Germany, Japan, Belgium, Austria, Netherlands, Finland
- Updated
- 22 Jul 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about Voluntary certification scheme for waste treatment
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | ended |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The CEWASTE project contributes to an improved recovery of valuable and critical raw materials (CRMs) from key types of waste through traceable and sustainable treatment processes in the entire supply chain of secondary raw materials. As such, CEWASTE will address the specific challenge to secure the sustainable access to CRMs for the EU economy and objectives set by the EU action plan for the Circular Economy, the issue of illegal trade of wastes within the EU and to non-EU countries and the need to support the development of environmentally and socially sound recycling systems globally. Specifically, the project will develop, validate and launch a voluntary certification scheme for collection, transport and treatment facilities of key types of waste containing significant amounts of valuable and critical raw materials. To ensure a comprehensive approach and a robust result, the project will be developed along the following six specific objectives: Objective 1 - Understand existing recovery practice, standards and verification schemes; Objective 2 - Develop sustainability and traceability requirements; Objective 3 - Develop an assurance system and related verification procedures; Objective 4 - Validate the new voluntary scheme; Objective 5 - Ensure long term sustainability of the scheme; Objective 6 - Ensure a transparent stakeholder process. |
Location
Country | Switzerland, Germany, Japan, Belgium, Austria, Netherlands, Finland |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Warehouse, Education |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
