Voorhies Hall
Sector: Car parking • Location: Davis, California, United States of America
Source: UC Davis
Voorhies Hall has been identified as a high priority, level VI rated, building for seismic improvements. Seismic Renovation Strengthen floor diaphragm at interior building corners Strengthen building foundations at the building perimeter and courtyard Improve column lateral stability with concrete shear walls at exterior corners Fire, Accessibility & Other Code Improvements The following scope wil
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Voorhies Hall has been identified as a high priority, level VI rated, building for seismic improvements. Seismic Renovation Strengthen floor diaphragm at interior building corners Strengthen building foundations at the building perimeter and courtyard Improve column lateral stability with concrete shear walls at exterior corners Fire, Accessibility & Other Code Improvements The following scope will be executed in compliance with the National Fire Protection Association standards (NFPA), the California Building Code (CBC) and Americans with Disabilities Act Standards (ADA). Upgrade the existing fire alarm system Install an accessible parking stall Update path of travel to entrances Update interior illuminated exit signage and room signage Remodel existing restrooms (men’s and women’s) Remove and replace interior stair guardrail and handrail Electrical Panel Replacements Electrical panels that have reached end of life will be replaced to help support electrical needs throughout the building. When possible, this work may be completed on a separate timeline from the other project work to help alleviate outages during business hours. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
