Voortrekker Road Bridge Rehabilitation and Reopening
One of 1,333 projects Taiyo tracks in Western Cape.
Source: Cape Argus
The project involved the rehabilitation and reopening of the eastbound lane of the Voortrekker Road bridge between Salt River and Maitland, which was closed after an extensive fire in December 2015. The 100 metre section of the lane was repaired and safety barriers were provided during the closure. The project was managed by the Passenger Rail Agency of SA (PRASA) with support from the City of Cap
- Status
- Closed
- Sector
- Bridge, Rail
- Location
- Cape Town, Western Cape, South Africa
- Updated
- 22 Jul 2026
- Source
- Cape Argus
ConstructChat
Ask ConstructChat about Voortrekker Road Bridge Rehabilitation and Reopening
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involved the rehabilitation and reopening of the eastbound lane of the Voortrekker Road bridge between Salt River and Maitland, which was closed after an extensive fire in December 2015. The 100 metre section of the lane was repaired and safety barriers were provided during the closure. The project was managed by the Passenger Rail Agency of SA (PRASA) with support from the City of Cape Town. |
Original sector | Transportation |
Location
Country | South Africa |
State | Western Cape |
City | Cape Town |
Source
Source | Cape Argus |
URL |
More Details
Record type | Project |
Sector | Bridge, Rail |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
