logo
ProjectCompleted

Vorotan Hydros

One of 3,599 projects Taiyo tracks in Armenia.

Source: International Finance Corporation (IFC)

The proposed project entails the acquisition, operation, maintenance and major electro-mechanical rehabilitation of the 404.2MW Vorotan cascade of hydropower plants (HPPs) along the Vorotan River (together, the “Vorotan Cascade”) in southern Armenia (the “project”), including the following:76MW Spandaryan HPP, Spandaryan Dam (Embankment type, Mixed Rockfill & Earthfill, 83m dam height), plus Ange

Status
Closed
Sector
Water Supply and Storage, Solar, Power Generation (CCGT), Geothermal, Hydro, Consumer Products, Oil and Gas, Commercial, Natural Gas, Wind, Government
Location
Armenia
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Vorotan Hydros

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Vorotan Hydros” is an infrastructure initiative in the Water Supply and Storage sector, located in Armenia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Company

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project entails the acquisition, operation, maintenance and major electro-mechanical rehabilitation of the 404.2MW Vorotan cascade of hydropower plants (HPPs) along the Vorotan River (together, the “Vorotan Cascade”) in southern Armenia (the “project”), including the following:76MW Spandaryan HPP, Spandaryan Dam (Embankment type, Mixed Rockfill & Earthfill, 83m dam height), plus Angeghakot Reservoir, commissioned in 1989;171MW Shamb HPP, Tolors Dam (Embankment type, Sandy gravel Soil, 70m dam height), commissioned in 1979; and157.2MW Tatev HPP, Tatev Dam (Embankment type, Sandy gravel, 41m dam height), plus Daily Regulation Reservoir, commissioned in 1970.The Vorotan Cascade is among the main power generation complexes in Armenia, providing both peak and base load generation, and performing grid stabilization services. The Vorotan Cascade is supported by a system of five reservoirs: Spandaryan, Angeghakot, Tolors, Shamb and a daily regulation reservoir. A newly created Armenian company, ContourGlobal Hydrocascade CJSC (the “company” or the “project company”), which is wholly-owned by ContourGlobal, a global developer and operator of power generation projects, is acquiring the Vorotan Cascade assets from Vorotan Complex of Hydro Power Plants CJSC, a state-owned company.ContourGlobal currently owns over 30 power generation plants in 17 countries around the world, totaling approximately 3.5 GW of installed capacity and projects under construction. These include thermal (fueled by natural gas, diesel, fuel oil and coal), wind, solar, and hydro types of power generation. ContourGlobal also owns and operates small captive energy generation facilities on-site for commercial beverage bottling companies worldwide. ContourGlobal is a privately-held company that was founded in 2005 by its Chief Executive Officer Joseph Brandt and Reservoir Capital Group, LLC, a New-York basedinvestment firm with over $6 billion in assets under management. The project company is wholly-owned by a ContourGlobal subsidiary.ContourGlobal is acquiring the Vorotan Cascade at a purchase price of US$180 million. As part of the acquisition agreement, the company will invest an additional US$70 million to undertake major electro-mechanical rehabilitation of the three hydropower plants in the Vorotan Cascade. The acquisition and rehabilitation program is being financed with a mix of long-term debt and equity. IFC’s proposed equity investment in the Company is for up to US$15.6 million.

Original sector

V-BA - Large Hydro - Renewable Energy Generation

Location

Country

Armenia

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Solar, Power Generation (CCGT), Geothermal, Hydro, Consumer Products, Oil and Gas, Commercial, Natural Gas, Wind, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project