logo
ProjectCompleted

Vorotan Refi

Completed · Armenia

Source: International Finance Corporation (IFC)

  The proposed project involves up to US$150 million debt refinancing package for ContourGlobal Hydro Cascade CJSC (the “Company”, an existing IFC investee company) in Armenia. In July 2015, the Company acquired the 404.2MW Vorotan cascade hydropower generation plants in southern Armenia, including the 76MW Spandaryan HPP (commissioned in 1989), the 171MW Shamb HPP (commissioned in 1978) and the 1

Status
Closed
Sector
Hydro, Power Generation (CCGT), Power Transmission, Government
Location
Armenia
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Vorotan Refi

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Vorotan Refi” is an infrastructure initiative in the Hydro sector, located in Armenia. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Company

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project involves up to US$150 million debt refinancing package for ContourGlobal Hydro Cascade CJSC (the “Company”, an existing IFC investee company) in Armenia. In July 2015, the Company acquired the 404.2MW Vorotan cascade hydropower generation plants in southern Armenia, including the 76MW Spandaryan HPP (commissioned in 1989), the 171MW Shamb HPP (commissioned in 1978) and the 157.2MW Tatev HPP (commissioned in 1970) plants along the Vorotan River (together, the Vorotan Cascade). In 2016, IFC arranged a US$140mn financing package to refinance the second instalment of the privatization (#37652, summary of the investment: https://disclosures.ifc.org/project-detail/ESRS/37652/vorotan-debt). The Vorotan Cascade is among the main power generation complexes in Armenia, providing both peak and base load generation, and performing grid stabilization services. The Vorotan Cascade is supported by a system of four reservoirs: Spandaryan, Angeghakot, Tolors, Shamb and a Tatev daily regulation pond. The new financing is aimed to re-leverage the Company, and through doing so support new modernization investments and free up liquidity for renewable energy (RE) pipeline in emerging markets.

Original sector

V-BA - Large Hydro - Renewable Energy Generation

Location

Country

Armenia

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Power Transmission, Government

Article published date

2025-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project