Vorotan Refi
One of 3,599 projects Taiyo tracks in Armenia.
Source: International Finance Corporation (IFC)
The proposed project involves up to US$150 million debt refinancing package for ContourGlobal Hydro Cascade CJSC (the “Company”, an existing IFC investee company) in Armenia. In July 2015, the Company acquired the 404.2MW Vorotan cascade hydropower generation plants in southern Armenia, including the 76MW Spandaryan HPP (commissioned in 1989), the 171MW Shamb HPP (commissioned in 1978) and the 1
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Power Transmission, Government
- Location
- Armenia
- Updated
- 19 Nov 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Vorotan Refi
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | pending |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed project involves up to US$150 million debt refinancing package for ContourGlobal Hydro Cascade CJSC (the “Company”, an existing IFC investee company) in Armenia. In July 2015, the Company acquired the 404.2MW Vorotan cascade hydropower generation plants in southern Armenia, including the 76MW Spandaryan HPP (commissioned in 1989), the 171MW Shamb HPP (commissioned in 1978) and the 157.2MW Tatev HPP (commissioned in 1970) plants along the Vorotan River (together, the Vorotan Cascade). In 2016, IFC arranged a US$140mn financing package to refinance the second instalment of the privatization (#37652, summary of the investment: https://disclosures.ifc.org/project-detail/ESRS/37652/vorotan-debt). The Vorotan Cascade is among the main power generation complexes in Armenia, providing both peak and base load generation, and performing grid stabilization services. The Vorotan Cascade is supported by a system of four reservoirs: Spandaryan, Angeghakot, Tolors, Shamb and a Tatev daily regulation pond. The new financing is aimed to re-leverage the Company, and through doing so support new modernization investments and free up liquidity for renewable energy (RE) pipeline in emerging markets. |
Original sector | V-BA - Large Hydro - Renewable Energy Generation |
Location
Country | Armenia |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Power Transmission, Government |
Article published date | 2025-09-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
