logo

Vostok Energy

Sector: Government • Location: Russia

Source: European Bank for Reconstruction and Development (EBRD)

Project
Complete

The EBRD is considering providing financing of up to $100 million to Vostok Energy to allow it to develop the Western part of Bortovoye licensed field in the Saratov Region. This would include some additional exploration and production drilling, completion of construction (already underway) of field facilities, gas processing unit and financing of implementation of the Environmental and Social Act

Project Information FAQ

Project Information

4 Q
The project “Vostok Energy” is an infrastructure initiative in the Government sector, located in Russia. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The EBRD is considering providing financing of up to $100 million to Vostok Energy to allow it to develop the Western part of Bortovoye licensed field in the Saratov Region. This would include some additional exploration and production drilling, completion of construction (already underway) of field facilities, gas processing unit and financing of implementation of the Environmental and Social Action Plan. i) support to a small private, independent gas producer in Russia, where upstream oil and gas production is increasingly dominated by large state-owned companies; and ii) setting standards of corporate governance and business/environmental conduct. Vostok Energy Limited is a privately owned oil and gas company incorporated in 2006 in accordance with the laws of England and Wales. The Company via its subsidiary holds licences for oil and gas production in Saratov region. Up to $60 million convertible debt loan. The Company intends to spend over $220 million on development of its Bortovoye licence in Saratov region over the period from 2009 to 2011 inclusive. This project has been categorized as B level (in accordance with the 2008 Environment and Social Policy) as it is not a green field development and it is not a major expansion of an existing facility. Therefore, the potential environmental and social impacts can readily be identified and assessed. An independent environmental consultant was retained to complete an environmental audit of the existing facilities and the corporate environmental management resources/capabilities and to complete an environmental analysis of the proposed project. This work has included the preparation of an Environmental and Social Action Plan, a Compensation Framework and a Stakeholder Engagement Plan. The results of this work indicate that overall, the company is doing a good job of addressing environmental and social issues. They have a very effective program of communicating with the local communities and the district and municipal administration. They have already initiated the work on the environmental and occupational health and safety management systems, and plan on having these systems certified in accordance with international standards by the end of 2011. In addition to this, the company will be increasing their environment, health and safety (EHS) control onsite through the provision of up to six new positions (field personnel) on the EHS staff, mainly for the control of EHS related items with contractors. Other pertinent actions captured in the Environmental and Social Action Plan includes the following: In addition to the actions listed above, the company will ensure that all operations are conducted in accordance with EBRD Performance Requirements, and that pre-acquisition environmental audits are completed for any new assets, and that the required Environmental and Social Analysis or Environmental and Social Impact Assessments are completed for any new developments. None Mr. Aric Cunningham Vostok Energy Limited 4/5 Park Place London, SW1A 1LP, UK Telephone: +44 (0)207 898 9236 Fax: +44 (0)207 898 9206

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data