logo

VRG Dak Sin I SHPP

Sector: Wind • Location: Vietnam

Source: World Bank Group

Project
Active

Vietnam Rubber Group (VRG) Dak Nong developed the 27MW Dak Sin 1 small hydropower plant, Dong Nai River, Dak Sin and Hung Binh communes, Dak R'lap District, Dak Nong Province. The project comprised of two 13.5 turbines (88.5% efficiency) and was expected to generate 104,128 MWh annually. The project load factor was 44.57%.

The turbines had a lifetime of 25 years. The Feasibility Study Report was

Status
Prospective
Sector
Wind, Hydro, Power Generation (CCGT), Commercial, Government
Location
Vietnam
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about VRG Dak Sin I SHPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “VRG Dak Sin I SHPP” is an infrastructure initiative in the Wind sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Vietnam Rubber Group (VRG) Dak Nong developed the 27MW Dak Sin 1 small hydropower plant, Dong Nai River, Dak Sin and Hung Binh communes, Dak R'lap District, Dak Nong Province. The project comprised of two 13.5 turbines (88.5% efficiency) and was expected to generate 104,128 MWh annually. The project load factor was 44.57%. The turbines had a lifetime of 25 years. The Feasibility Study Report was approved in January 2009. The EPC contract was signed in November 2009. The contract with the Department of Energy was signed in July 2010. Expected commissioning date was January 2012. Project life was expected to be 40 years. The tariff was expected to be US$ cents 4.4/kWh (VND 769/kWh). The EIA was approved by the ministry of Natural Resource and Environment in January 2008. The EPC contract was awarded to Cavico Corporation (Vietnam) in joint operations as Cavico-COMA-Song Da, at a value of US$30.2 million, of which US$18 million was Cavico's share. Construction time was 27 months. Total project cost was VND 670,904 million (US$32.2 million). Project coordinates: 107o 27'18" East longitude, 11o 47'25" North latitude http://hydro.energy-business-review.com/news/cavico_receives_epc_contract_from_vrg%E2%80%93dak_nong_at_dak_sin_hydropower_plant_091118 https://cdm.unfccc.int/filestorage/0/5/S/05SXH21G9ZNATQRCVB6YFW4IEJM7UD/5533%20PDD.pdf?t=SnB8bWkyc2MxfDD1SGTCkvtILVyDwD_LVG2n

Original sector

Energy

Budget

Location

Country

Vietnam

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Hydro, Power Generation (CCGT), Commercial, Government

Article published date

2024-06-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project