VRG Dak Sin I SHPP
Sector: Wind • Location: Dac Nong, Vietnam
Source: World Bank Group
Vietnam Rubber Group (VRG) Dak Nong developed the 27MW Dak Sin 1 small hydropower plant, Dong Nai River, Dak Sin and Hung Binh communes, Dak R'lap District, Dak Nong Province. The project comprised of two 13.5 turbines (88.5% efficiency) and was expected to generate 104,128 MWh annually. The project load factor was 44.57%.
The turbines had a lifetime of 25 years. The Feasibility Study Report was
- Status
- Prospective
- Sector
- Wind, Hydro, Power Generation (CCGT), Commercial, Government
- Location
- Dac Nong, Vietnam
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about VRG Dak Sin I SHPP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Vietnam Rubber Group (VRG) Dak Nong developed the 27MW Dak Sin 1 small hydropower plant, Dong Nai River, Dak Sin and Hung Binh communes, Dak R'lap District, Dak Nong Province. The project comprised of two 13.5 turbines (88.5% efficiency) and was expected to generate 104,128 MWh annually. The project load factor was 44.57%. The turbines had a lifetime of 25 years. The Feasibility Study Report was approved in January 2009. The EPC contract was signed in November 2009. The contract with the Department of Energy was signed in July 2010. Expected commissioning date was January 2012. Project life was expected to be 40 years. The tariff was expected to be US$ cents 4.4/kWh (VND 769/kWh). The EIA was approved by the ministry of Natural Resource and Environment in January 2008. The EPC contract was awarded to Cavico Corporation (Vietnam) in joint operations as Cavico-COMA-Song Da, at a value of US$30.2 million, of which US$18 million was Cavico's share. Construction time was 27 months. Total project cost was VND 670,904 million (US$32.2 million). Project coordinates: 107o 27'18" East longitude, 11o 47'25" North latitude http://hydro.energy-business-review.com/news/cavico_receives_epc_contract_from_vrg%E2%80%93dak_nong_at_dak_sin_hydropower_plant_091118 https://cdm.unfccc.int/filestorage/0/5/S/05SXH21G9ZNATQRCVB6YFW4IEJM7UD/5533%20PDD.pdf?t=SnB8bWkyc2MxfDD1SGTCkvtILVyDwD_LVG2n |
Original sector | Energy |
Budget |
Location
Country | Vietnam |
State | Dac Nong |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Wind, Hydro, Power Generation (CCGT), Commercial, Government |
Article published date | 2024-05-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
