logo

VRG Dak Sin I SHPP

Sector: Commercial • Location: Vietnam

Source: World Bank Group

Project
Active

Vietnam Rubber Group (VRG) Dak Nong developed the 27MW Dak Sin 1 small hydropower plant, Dong Nai River, Dak Sin and Hung Binh communes, Dak R'lap District, Dak Nong Province. The project comprised of two 13.5 turbines (88.5% efficiency) and was expected to generate 104,128 MWh annually. The project load factor was 44.57%.

The turbines had a lifetime of 25 years. The Feasibility Study Report was

Project Information FAQ

Project Information

5 Q
The project “VRG Dak Sin I SHPP” is an infrastructure initiative in the Commercial sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Vietnam Rubber Group (VRG) Dak Nong developed the 27MW Dak Sin 1 small hydropower plant, Dong Nai River, Dak Sin and Hung Binh communes, Dak R'lap District, Dak Nong Province. The project comprised of two 13.5 turbines (88.5% efficiency) and was expected to generate 104,128 MWh annually. The project load factor was 44.57%. The turbines had a lifetime of 25 years. The Feasibility Study Report was approved in January 2009. The EPC contract was signed in November 2009. The contract with the Department of Energy was signed in July 2010. Expected commissioning date was January 2012. Project life was expected to be 40 years. The tariff was expected to be US$ cents 4.4/kWh (VND 769/kWh). The EIA was approved by the ministry of Natural Resource and Environment in January 2008. The EPC contract was awarded to Cavico Corporation (Vietnam) in joint operations as Cavico-COMA-Song Da, at a value of US$30.2 million, of which US$18 million was Cavico's share. Construction time was 27 months. Total project cost was VND 670,904 million (US$32.2 million). Project coordinates: 107o 27'18" East longitude, 11o 47'25" North latitude http://hydro.energy-business-review.com/news/cavico_receives_epc_contract_from_vrg%E2%80%93dak_nong_at_dak_sin_hydropower_plant_091118 https://cdm.unfccc.int/filestorage/0/5/S/05SXH21G9ZNATQRCVB6YFW4IEJM7UD/5533%20PDD.pdf?t=SnB8bWkyc2MxfDD1SGTCkvtILVyDwD_LVG2n

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data