VRG Dak Sin I SHPP
Sector: Hydro • Location: Vietnam
Source: World Bank Group
Vietnam Rubber Group (VRG) Dak Nong developed the 27MW Dak Sin 1 small hydropower plant, Dong Nai River, Dak Sin and Hung Binh communes, Dak R'lap District, Dak Nong Province. The project comprised of two 13.5 turbines (88.5% efficiency) and was expected to generate 104,128 MWh annually. The project load factor was 44.57%.
The turbines had a lifetime of 25 years. The Feasibility Study Report was
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Vietnam Rubber Group (VRG) Dak Nong developed the 27MW Dak Sin 1 small hydropower plant, Dong Nai River, Dak Sin and Hung Binh communes, Dak R'lap District, Dak Nong Province. The project comprised of two 13.5 turbines (88.5% efficiency) and was expected to generate 104,128 MWh annually. The project load factor was 44.57%. The turbines had a lifetime of 25 years. The Feasibility Study Report was approved in January 2009. The EPC contract was signed in November 2009. The contract with the Department of Energy was signed in July 2010. Expected commissioning date was January 2012. Project life was expected to be 40 years. The tariff was expected to be US$ cents 4.4/kWh (VND 769/kWh). The EIA was approved by the ministry of Natural Resource and Environment in January 2008. The EPC contract was awarded to Cavico Corporation (Vietnam) in joint operations as Cavico-COMA-Song Da, at a value of US$30.2 million, of which US$18 million was Cavico's share. Construction time was 27 months. Total project cost was VND 670,904 million (US$32.2 million). Project coordinates: 107o 27'18" East longitude, 11o 47'25" North latitude http://hydro.energy-business-review.com/news/cavico_receives_epc_contract_from_vrg%E2%80%93dak_nong_at_dak_sin_hydropower_plant_091118 https://cdm.unfccc.int/filestorage/0/5/S/05SXH21G9ZNATQRCVB6YFW4IEJM7UD/5533%20PDD.pdf?t=SnB8bWkyc2MxfDD1SGTCkvtILVyDwD_LVG2n |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
