logo
ProjectConstruction Documents

VT/DOT: VT 12 Bridge#94 Replacement

One of 7,161 projects Taiyo tracks in Vermont.

Source: Dodge USA

ELMORE, VT12, BRIDGE NO. 94 (SHORT); OTHER, SCOPING TO EVALUATE ALTERNATIVES. PENG, ROWA, REPLACE CULVERT.

Status
Closed
Sector
Bridge, Road, Water Supply and Storage, Waste Processing and Treatment, Commercial
Location
Elmore, Vermont, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about VT/DOT: VT 12 Bridge 94 Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “VT/DOT: VT 12 Bridge 94 Replacement” is an infrastructure initiative in the Bridge sector, located in Elmore, Vermont, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ELMORE, VT12, BRIDGE NO. 94 (SHORT); OTHER, SCOPING TO EVALUATE ALTERNATIVES. PENG, ROWA, REPLACE CULVERT.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Vermont

City

Elmore

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Road, Water Supply and Storage, Waste Processing and Treatment, Commercial

Article published date

2024-10-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project