Vietnam Trading Engineering Construction JSC was planning the development of the 45 MW Bac Me Hydropower Plant, Yen Phong commune, Bac Me district, Ha Giang province. The project was expected to generate 188,491 MWh annually to be supplied to the national grid.
The project was to consist of two turbines 25 MW each, and two generators 22.5MW each. Commissioning was expected for November 2014. The
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | active |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Vietnam Trading Engineering Construction JSC was planning the development of the 45 MW Bac Me Hydropower Plant, Yen Phong commune, Bac Me district, Ha Giang province. The project was expected to generate 188,491 MWh annually to be supplied to the national grid. The project was to consist of two turbines 25 MW each, and two generators 22.5MW each. Commissioning was expected for November 2014. The design was approved in June 2011. The EIA was completed in November 2011 was expected to be approved in February 2012. Construction was expected to start in Q2 of 2012, equipment supply contracts to be signed in Q4 of 2012 and commissioning for Q4 2012 as reported above. Expected project life was 40 years. "According to Decision 2014, the tariff for hydropower projects with installed capacity smaller than 30MW ranges from 2.7UScent/kWh to 5.2 UScent/kWh in dry season and from 2.5UScent/kWh to 5.0 UScent/kWh in wet season. The dry season is defined from 1st October to 30thJune next year, and the wet season from 1stJuly to 30thSeptember, Thus the average power tariff is 4US$cent/kWh equivalent with 824.8 VND/kWh at the time of making the board decision." UNFCCC CDM PDD. Financial close was reached in July 2011, with Industrial and Commercial Bank of China Limited. Total investment was expected to be VND 1,454 billion ($69.8 million). http://cdm.unfccc.int/filestorage/I/6/T/I6TCNVQZUK30Y7G5FRJPLXEWA41M28/PDD_Bac%20Me%20Hydro.pdf?t=UGp8bTIyZjBvfDBDPenxYRAcYI2Q53-yipKx Sponsor needs to be added. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |