VTEC Bac Me HPP

Sector: Commercial • Location: Vietnam

Source: World Bank Group

Project
Active

Vietnam Trading Engineering Construction JSC was planning the development of the 45 MW Bac Me Hydropower Plant, Yen Phong commune, Bac Me district, Ha Giang province. The project was expected to generate 188,491 MWh annually to be supplied to the national grid.

The project was to consist of two turbines 25 MW each, and two generators 22.5MW each. Commissioning was expected for November 2014. The

Project Information FAQ

Project Information

5 Q
The project “VTEC Bac Me HPP” is an infrastructure initiative in the Commercial sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Vietnam Trading Engineering Construction JSC was planning the development of the 45 MW Bac Me Hydropower Plant, Yen Phong commune, Bac Me district, Ha Giang province. The project was expected to generate 188,491 MWh annually to be supplied to the national grid. The project was to consist of two turbines 25 MW each, and two generators 22.5MW each. Commissioning was expected for November 2014. The design was approved in June 2011. The EIA was completed in November 2011 was expected to be approved in February 2012. Construction was expected to start in Q2 of 2012, equipment supply contracts to be signed in Q4 of 2012 and commissioning for Q4 2012 as reported above. Expected project life was 40 years. "According to Decision 2014, the tariff for hydropower projects with installed capacity smaller than 30MW ranges from 2.7UScent/kWh to 5.2 UScent/kWh in dry season and from 2.5UScent/kWh to 5.0 UScent/kWh in wet season. The dry season is defined from 1st October to 30thJune next year, and the wet season from 1stJuly to 30thSeptember, Thus the average power tariff is 4US$cent/kWh equivalent with 824.8 VND/kWh at the time of making the board decision." UNFCCC CDM PDD. Financial close was reached in July 2011, with Industrial and Commercial Bank of China Limited. Total investment was expected to be VND 1,454 billion ($69.8 million). http://cdm.unfccc.int/filestorage/I/6/T/I6TCNVQZUK30Y7G5FRJPLXEWA41M28/PDD_Bac%20Me%20Hydro.pdf?t=UGp8bTIyZjBvfDBDPenxYRAcYI2Q53-yipKx Sponsor needs to be added.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data