Vietnam Trading Engineering Construction JSC was planning the development of the 45 MW Bac Me Hydropower Plant, Yen Phong commune, Bac Me district, Ha Giang province. The project was expected to generate 188,491 MWh annually to be supplied to the national grid.

The project was to consist of two turbines 25 MW each, and two generators 22.5MW each. Commissioning was expected for November 2014. The

Status
Prospective
Sector
Hydro, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
Vietnam
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about VTEC Bac Me HPP

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “VTEC Bac Me HPP” is an infrastructure initiative in the Hydro sector, located in Vietnam. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Vietnam Trading Engineering Construction JSC was planning the development of the 45 MW Bac Me Hydropower Plant, Yen Phong commune, Bac Me district, Ha Giang province. The project was expected to generate 188,491 MWh annually to be supplied to the national grid. The project was to consist of two turbines 25 MW each, and two generators 22.5MW each. Commissioning was expected for November 2014. The design was approved in June 2011. The EIA was completed in November 2011 was expected to be approved in February 2012. Construction was expected to start in Q2 of 2012, equipment supply contracts to be signed in Q4 of 2012 and commissioning for Q4 2012 as reported above. Expected project life was 40 years. "According to Decision 2014, the tariff for hydropower projects with installed capacity smaller than 30MW ranges from 2.7UScent/kWh to 5.2 UScent/kWh in dry season and from 2.5UScent/kWh to 5.0 UScent/kWh in wet season. The dry season is defined from 1st October to 30thJune next year, and the wet season from 1stJuly to 30thSeptember, Thus the average power tariff is 4US$cent/kWh equivalent with 824.8 VND/kWh at the time of making the board decision." UNFCCC CDM PDD. Financial close was reached in July 2011, with Industrial and Commercial Bank of China Limited. Total investment was expected to be VND 1,454 billion ($69.8 million). http://cdm.unfccc.int/filestorage/I/6/T/I6TCNVQZUK30Y7G5FRJPLXEWA41M28/PDD_Bac%20Me%20Hydro.pdf?t=UGp8bTIyZjBvfDBDPenxYRAcYI2Q53-yipKx Sponsor needs to be added.

Original sector

Energy

Budget

Location

Country

Vietnam

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Hydro, Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-09-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project