W Lowell Ave Bridge Replacement
One of 10,000+ projects Taiyo tracks in Massachusetts.
Source: Dodge
The city must undertake bridge repairs. Should the state grant additional Ch. 90 funds, these could be utilized as a potential funding source. City of Haverhill maybe seeking Engineering for the city must undertake bridge repairs. Should the state grant additional Ch. 90 funds, these could be utilized as a potential funding source.
- Status
- Prospective
- Sector
- Government, Bridge, Road, Power Transmission, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Haverhill, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about W Lowell Ave Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The city must undertake bridge repairs. Should the state grant additional Ch. 90 funds, these could be utilized as a potential funding source. City of Haverhill maybe seeking Engineering for the city must undertake bridge repairs. Should the state grant additional Ch. 90 funds, these could be utilized as a potential funding source. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Haverhill |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Bridge, Road, Power Transmission, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
