W4 System Improvements - MMSD Nine Springs WWTP
One of 10,000+ projects Taiyo tracks in Wisconsin.
Source: Dodge
W4 System Improvements project includes, but is not limited to, the replacement of the W4 system pumping and straining equipment, and replacement of the chemical storage tanks and chemical pumps. The work also includes piping replacement, site work, electrical, instrumentation and controls, plumbing, and other ancillary work required to accomplish the modifications. The Madison Metropolitan Sewera
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government
- Location
- Madison, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about W4 System Improvements - MMSD Nine Springs WWTP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | W4 System Improvements project includes, but is not limited to, the replacement of the W4 system pumping and straining equipment, and replacement of the chemical storage tanks and chemical pumps. The work also includes piping replacement, site work, electrical, instrumentation and controls, plumbing, and other ancillary work required to accomplish the modifications. The Madison Metropolitan Sewerage District is requesting proposals for engineering design services associated with the W4 System... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Madison |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
