Waddi Wind Farm
Sector: Raw Materials • Location: Dandaragan, Western Australia, Australia
Source: RenewEconomy
Tilt Renewables is seeking permission to increase the height of turbines at the proposed Waddi wind project in Western Australia to help prevent collisions with Carnaby black cockatoos. The project aims to raise the maximum turbine hub height from 112m to 139m and the tip height from 180m to 220m, while retaining the Vestas’ V162.60 Enventus turbine model.
- Status
- Under Construction
- Sector
- Raw Materials, Wind
- Location
- Dandaragan, Western Australia, Australia
- Updated
- 22 Jul 2026
- Source
- RenewEconomy
ConstructChat
Ask ConstructChat about Waddi Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Tilt Renewables is seeking permission to increase the height of turbines at the proposed Waddi wind project in Western Australia to help prevent collisions with Carnaby black cockatoos. The project aims to raise the maximum turbine hub height from 112m to 139m and the tip height from 180m to 220m, while retaining the Vestas’ V162.60 Enventus turbine model. |
Original sector | Renewables |
Location
Country | Australia |
State | Western Australia |
City | Dandaragan |
Source
Source | RenewEconomy |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Wind |
Article published date | 2025-04-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
