WADI BEIHAN AGRICULTURE
Closed · Yemen, Republic of
Source: World Bank Group
The project would increase agricultural production and farm income on about 4,000 ha of mixed spate (flood) and well irrigated lands in the Beihan subgovernorate by rehabilitating the spate irrigation network and improving the groundwater irrigation system of Wadi Beihan and by providing technical assistance, farm inputs and agricultural equipment for Wadi Beihan and Wadi Ain. It would establish a
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Waste Processing and Treatment, Consumer Products, Raw Materials, Government
- Location
- Yemen
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about WADI BEIHAN AGRICULTURE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project would increase agricultural production and farm income on about 4,000 ha of mixed spate (flood) and well irrigated lands in the Beihan subgovernorate by rehabilitating the spate irrigation network and improving the groundwater irrigation system of Wadi Beihan and by providing technical assistance, farm inputs and agricultural equipment for Wadi Beihan and Wadi Ain. It would establish a program of hydrometeorological observations in Wadi Beihan for improving knowledge of its water resources and ensuring their optimal utilization. In addition, it would improve access between agricultural and population centers in Wadi Beihan by constructing feeder roads, and improve the nutrition of the local population by increasing production of fruits, vegetables and meat. The project would benefit directly 5,000 families. In addition, 15,000 persons would benefit indirectly from the project through the increased availability of foodstuffs and easier access to markets and social and administrative services. The principal risks of not achieving the project's objectives are associated with an unsustainable rate of drawdown of groundwater in the project area and delays in realizing full production benefits. The project has been designed to minimize these risks. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Yemen |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Waste Processing and Treatment, Consumer Products, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
