logo

WA/DOT: 102nd Ave NE Shared Use Path Construction

Sector: Cement • Location: Bothell, Washington, United States of America

Source: Dodge

Project
Planning Schematics

Main Street to East Riverside Drive102nd Avenue NE Shared-Use Path Construct shared use path with planter strip, concrete curb, gutter, retaining walls, and illumination. Project area does not include 102nd Avenue NE Bridge.

Status
Prospective
Sector
Cement, Road, Commercial, Car parking, Bridge, Automotive
Location
Bothell, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about WA/DOT: 102nd Ave NE Shared Use Path Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WA/DOT: 102nd Ave NE Shared Use Path Construction” is an infrastructure initiative in the Cement sector, located in Bothell, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Main Street to East Riverside Drive102nd Avenue NE Shared-Use Path Construct shared use path with planter strip, concrete curb, gutter, retaining walls, and illumination. Project area does not include 102nd Avenue NE Bridge.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Bothell

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Road, Commercial, Car parking, Bridge, Automotive

Article published date

2025-02-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project