WA/DOT: ADA Construction
Planning schematics · Washington · Last reported Feb 2025
Source: Dodge
Noll Road Shared Use Path - Middle Segment Construct a separated ADA accessible shared use path, curb and gutter with connections to existing roadway and associated drainage in the middle segment of the Noll Road Corridor. Preliminary engineering and right of way funds are programmed in PB-16.
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Car parking, Commercial, Waste Processing and Treatment, Automotive
- Location
- Poulsbo, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WA/DOT: ADA Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Noll Road Shared Use Path - Middle Segment Construct a separated ADA accessible shared use path, curb and gutter with connections to existing roadway and associated drainage in the middle segment of the Noll Road Corridor. Preliminary engineering and right of way funds are programmed in PB-16. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Poulsbo |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Car parking, Commercial, Waste Processing and Treatment, Automotive |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
