WA/DOT: Everett Point Industrial Center Bridge Construction
Sector: Water Supply and Storage • Location: Everett, Washington, United States of America
Source: Dodge
County: Snohomish Agency: Everett Begin Termini E Grand Avenue End Termini Railway Avenue Everett Point Industrial Center (EPIC) Green Bridge Construct new two-lane bridge with sidewalks and bike lanes with a roundabout at Railway Avenue and reconstruct the storm drainage system within the project limits.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Planning Schematics |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | County: Snohomish Agency: Everett Begin Termini E Grand Avenue End Termini Railway Avenue Everett Point Industrial Center (EPIC) Green Bridge Construct new two-lane bridge with sidewalks and bike lanes with a roundabout at Railway Avenue and reconstruct the storm drainage system within the project limits. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
