WA/DOT: Grid Deck Replacement
Planning schematics · Washington · Last reported Mar 2024
Source: Dodge USA
SR 99/Northbound Duwamish River Bridge - Grid Deck Replacement 82 grid deck panels are failing, and maintenance repairs cover them with steel plates. Replacing these panels will provide a more solid driving surface with better skid resistance. This is a multi-year project, and the programming reflects the planned expenditure schedule within the span of the current TIP. MP 26.55 to MP 27.12
- Status
- Prospective
- Sector
- Bridge, Steel, Road, Metal, Commercial
- Location
- Seattle, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WA/DOT: Grid Deck Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SR 99/Northbound Duwamish River Bridge - Grid Deck Replacement 82 grid deck panels are failing, and maintenance repairs cover them with steel plates. Replacing these panels will provide a more solid driving surface with better skid resistance. This is a multi-year project, and the programming reflects the planned expenditure schedule within the span of the current TIP. MP 26.55 to MP 27.12 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Seattle |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Bridge, Steel, Road, Metal, Commercial |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
