WA/DOT: Hwy 99 Revitalization
Sector: Power Transmission • Location: Edmonds, Washington, United States of America
Source: Dodge USA
Hwy 99 Revitalization Project from 220th St. SW to 224th St. SW This project will provide an additional northbound and southbound left-turn lane and westbound right-turn lane at the Hwy 99 @ 220th Street SW signalized intersection, and the intersection be improved to accommodate U-turns on Hwy 99. The project also includes sidewalk widening with landscaped buffer, street lighting and landscape enh
- Status
- Prospective
- Sector
- Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Commercial, Car parking, Road, Automotive, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Edmonds, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WA/DOT: Hwy 99 Revitalization
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Hwy 99 Revitalization Project from 220th St. SW to 224th St. SW This project will provide an additional northbound and southbound left-turn lane and westbound right-turn lane at the Hwy 99 @ 220th Street SW signalized intersection, and the intersection be improved to accommodate U-turns on Hwy 99. The project also includes sidewalk widening with landscaped buffer, street lighting and landscape enhancements, ADA curb ramp and signal push button upgrades, new stormwater infrastructure, and util... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Edmonds |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Water Supply and Storage, Waste Processing and Treatment, Commercial, Car parking, Road, Automotive, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
