WA/DOT: I-5 Interstate Bridge Electrical
Planning schematics · Washington · Last reported Nov 2024
Source: Dodge USA
I-5/Interstate Bridge - Electrical Control System Upgrade A $6 billion megaproject to replace the main twin bridges over the Columbia River on Interstate 5, extend the MAX Yellow Line to Vancouver, replace the North Portland Harbor Bridge, and modify seven interchanges along the I-5 corridor
- Status
- Prospective
- Sector
- Seaport, Bridge, Commercial, Power Generation (CCGT), Power Transmission, Road
- Location
- Vancouver, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WA/DOT: I-5 Interstate Bridge Electrical
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | I-5/Interstate Bridge - Electrical Control System Upgrade A $6 billion megaproject to replace the main twin bridges over the Columbia River on Interstate 5, extend the MAX Yellow Line to Vancouver, replace the North Portland Harbor Bridge, and modify seven interchanges along the I-5 corridor |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Vancouver |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Seaport, Bridge, Commercial, Power Generation (CCGT), Power Transmission, Road |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
