WA/DOT: I-5 Shared Use Path Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
-5/Steilacoom-DuPont Rd to Gravelly Lake Dr - Corridor Improvements. Lenght 5.690. This segment of I-5 experiences congestion and mobility problems due to high traffic volumes. This project constructs a pedestrian / bike path between Steilacoom-DuPont Road and Berkeley Street and a SB connector lane between Thorne Lane and Gravelly Lake Drive. When complete, this corridor will benefit from reduced
- Status
- Prospective
- Sector
- Car parking, Road, Automotive, Commercial
- Location
- Dupont, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WA/DOT: I-5 Shared Use Path Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | -5/Steilacoom-DuPont Rd to Gravelly Lake Dr - Corridor Improvements. Lenght 5.690. This segment of I-5 experiences congestion and mobility problems due to high traffic volumes. This project constructs a pedestrian / bike path between Steilacoom-DuPont Road and Berkeley Street and a SB connector lane between Thorne Lane and Gravelly Lake Drive. When complete, this corridor will benefit from reduced congestion, enhanced freight mobility, improved safety and support economic growth. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Dupont |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Automotive, Commercial |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
