logo

WA/DOT: I-82 Yakima River Bridge Improvement

Sector: Road • Location: Yakima, Washington, United States of America

Source: Dodge USA

Project
Planning Schematics

East-West Corridor -- I-82 Turnbacks Limits to End of N. Keys Rd. --Phase 3. Construct the portion of a new arterial connecting Yakima with Terrace Heights form the Yakima River to Bravo Company Blvd. the EW Corridor Project (Cascade Mill Parkway) will consist of a 4 and 5-lane facility with bike lanes, curb, gutter and sidewalk and shared use pathway. This project will also construct a new Yakima

Status
Prospective
Sector
Road, Commercial, Manufacturing (Industrial), Car parking, Bridge, Automotive
Location
Yakima, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about WA/DOT: I-82 Yakima River Bridge Improvement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “WA/DOT: I-82 Yakima River Bridge Improvement” is an infrastructure initiative in the Road sector, located in Yakima, Washington, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

East-West Corridor -- I-82 Turnbacks Limits to End of N. Keys Rd. --Phase 3. Construct the portion of a new arterial connecting Yakima with Terrace Heights form the Yakima River to Bravo Company Blvd. the EW Corridor Project (Cascade Mill Parkway) will consist of a 4 and 5-lane facility with bike lanes, curb, gutter and sidewalk and shared use pathway. This project will also construct a new Yakima River Bridge and two I-82 bridges to allow Cascade Mill Parkway to pass beneath I-82

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Yakima

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Road, Commercial, Manufacturing (Industrial), Car parking, Bridge, Automotive

Article published date

2024-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project