WA/DOT: I-82 Yakima River Bridge Improvement
Sector: Road • Location: Yakima, Washington, United States of America
Source: Dodge USA
East-West Corridor -- I-82 Turnbacks Limits to End of N. Keys Rd. --Phase 3. Construct the portion of a new arterial connecting Yakima with Terrace Heights form the Yakima River to Bravo Company Blvd. the EW Corridor Project (Cascade Mill Parkway) will consist of a 4 and 5-lane facility with bike lanes, curb, gutter and sidewalk and shared use pathway. This project will also construct a new Yakima
- Status
- Prospective
- Sector
- Road, Commercial, Manufacturing (Industrial), Car parking, Bridge, Automotive
- Location
- Yakima, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WA/DOT: I-82 Yakima River Bridge Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | East-West Corridor -- I-82 Turnbacks Limits to End of N. Keys Rd. --Phase 3. Construct the portion of a new arterial connecting Yakima with Terrace Heights form the Yakima River to Bravo Company Blvd. the EW Corridor Project (Cascade Mill Parkway) will consist of a 4 and 5-lane facility with bike lanes, curb, gutter and sidewalk and shared use pathway. This project will also construct a new Yakima River Bridge and two I-82 bridges to allow Cascade Mill Parkway to pass beneath I-82 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Yakima |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Commercial, Manufacturing (Industrial), Car parking, Bridge, Automotive |
Article published date | 2024-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
