WA/DOT: I-90 EB Bridge Replacements
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge USA
I-90/Eastbound East Channel Bridge - Modular Assembly Joints The Modular Assembly Joints on the I-90 EB East Channel Bridge are deteriorating and have reached the end of their service life. Replacing the existing expansion joints will preserve the bridge structural integrity and extend its service life. This is a multi-year project; the programming reflects the planned expenditure schedule within
- Status
- Closed
- Sector
- Commercial, Bridge, Road
- Location
- Mercer Island, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WA/DOT: I-90 EB Bridge Replacements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | I-90/Eastbound East Channel Bridge - Modular Assembly Joints The Modular Assembly Joints on the I-90 EB East Channel Bridge are deteriorating and have reached the end of their service life. Replacing the existing expansion joints will preserve the bridge structural integrity and extend its service life. This is a multi-year project; the programming reflects the planned expenditure schedule within the span of the current TIP |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Mercer Island |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Road |
Article published date | 2024-11-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
