WA/DOT: I-90/West Village Park & Schneider Ck Fish Passage
Planning schematics · Washington · Last reported Aug 2024
Source: Dodge USA
The project will replace three fish barriers and replace them with fish-passable crossings at I-90 Lewis Creek, I-90 West Village Park Creek, and I-90 Schneider Creek. The work includes but is not limited to the following. Design and construction of fish passable water crossing and structures, including all associated stream restoration. Acquisition of environmental permits. Temporary and permanen
- Status
- Prospective
- Sector
- Car parking, Power Transmission, Waste Processing and Treatment, Water Supply and Storage, Automotive, Commercial, Raw Materials, Power Generation (CCGT)
- Location
- Olympia, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about WA/DOT: I-90/West Village Park & Schneider Ck Fish Passage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will replace three fish barriers and replace them with fish-passable crossings at I-90 Lewis Creek, I-90 West Village Park Creek, and I-90 Schneider Creek. The work includes but is not limited to the following. Design and construction of fish passable water crossing and structures, including all associated stream restoration. Acquisition of environmental permits. Temporary and permanent utility adjustment and relocation. Other elements including, but not limited to embankment, gra... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Olympia |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Car parking, Power Transmission, Waste Processing and Treatment, Water Supply and Storage, Automotive, Commercial, Raw Materials, Power Generation (CCGT) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
