WA/DOT: Kellogg Hollow Improvements Phase 3
Sector: Water Supply and Storage • Location: Washington, United States of America
Source: Dodge
Kellogg Hollow - Phase 3 Proposed improvements widening, guardrail, BST, Ballast section, slope flattening, culvert replacement, roadside hazards/clear zone, striping, signing, delineation, and intersection improvements. including flashing 36" stop sign. 05 WA-12589 04 7.860 CE Yes 5.1 12.96 3,558,000 23-01
- Status
- Prospective
- Sector
- Water Supply and Storage, Mass Transit, Road, Rail, Commercial, Waste Processing and Treatment
- Location
- Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WA/DOT: Kellogg Hollow Improvements Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Kellogg Hollow - Phase 3 Proposed improvements widening, guardrail, BST, Ballast section, slope flattening, culvert replacement, roadside hazards/clear zone, striping, signing, delineation, and intersection improvements. including flashing 36" stop sign. 05 WA-12589 04 7.860 CE Yes 5.1 12.96 3,558,000 23-01 |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Mass Transit, Road, Rail, Commercial, Waste Processing and Treatment |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
