WA/DOT: Parking Lot Pavement Rehabilitation
Sector: Water Supply and Storage • Location: Bainbridge Island, Washington, United States of America
Source: Dodge
SR 305, Bainbridge Ferry Terminal - NE Parking Lot Pavement Rehabilitation Requires improvement of parking stalls, Americans with Disabilities (ADA) improvements, pavement excavation, hot mix asphalt (HMA) paving, striping, a new badge in employee gate, traffic control and other work. Involves 37 items and 40 working days. Work class 1 & 4 - clearing, grubbing, grading and draining and asphalt pav
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Car parking, Rail, Mass Transit, Automotive, Waste Processing and Treatment, Cement, Commercial
- Location
- Bainbridge Island, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WA/DOT: Parking Lot Pavement Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SR 305, Bainbridge Ferry Terminal - NE Parking Lot Pavement Rehabilitation Requires improvement of parking stalls, Americans with Disabilities (ADA) improvements, pavement excavation, hot mix asphalt (HMA) paving, striping, a new badge in employee gate, traffic control and other work. Involves 37 items and 40 working days. Work class 1 & 4 - clearing, grubbing, grading and draining and asphalt paving or work class 1 & 17 - clearing, grubbing, grading and draining and cement concrete curb and ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Bainbridge Island |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Car parking, Rail, Mass Transit, Automotive, Waste Processing and Treatment, Cement, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
