WA/DOT: Pavement Restoration
One of 10,000+ projects Taiyo tracks in Washington.
Source: Dodge
Town of St John - Pavement Restoration Asphalt and Bituminous pavements require rehabilitation to preserve the roadway structure and the public investment in highways. Rehabilitate the existing pavement with hot mix asphalt pavement and bituminous surface treatment and upgrade safety features per Complete Streets within the project limits to maintain safe highway operations.
- Status
- Prospective
- Sector
- Mass Transit, Road, Rail, Commercial
- Location
- Saint John, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about WA/DOT: Pavement Restoration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Town of St John - Pavement Restoration Asphalt and Bituminous pavements require rehabilitation to preserve the roadway structure and the public investment in highways. Rehabilitate the existing pavement with hot mix asphalt pavement and bituminous surface treatment and upgrade safety features per Complete Streets within the project limits to maintain safe highway operations. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Saint John |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Road, Rail, Commercial |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Mass Transit projects in United States of America
- WMATA Orange and Blue Line Rehabilitation
- Dulles Metrorail Silver Line, Phase 2
- Broadway Substation Upgrades
- QLINE Streetcar Overhead Catenary System
- Blue Line Rail Power System Upgrades
- Congress Heights Station & Tunnel
- Navy Yard Metro West Entrance Modifications
- BART El Cerrito Del Norte Station Modernization Project
